A dataset provided by the European Space Agency

Name VEX-V-Y-MAG-2-EXT3
Mission VENUS-EXPRESS
URL https://archives.esac.esa.int/psa/ftp//VENUS-EXPRESS/MAG/VEX-V-Y-MAG-2-EXT3-V1.0
DOI https://doi.org/10.57780/esa-x27wrcz
Author European Space Agency
Abstract This data set comprises uncalibrated data from the Venus Express Mag (MAG) instrument. The data were collected during the Venus Express mission from Launch (9th November 2005) to the end of the mission. The basic data is comprised of uncalibrated raw data, along with geometry information. Also included documentation.
Description This data set comprises resampled calibrated data from the Venus Express Mag (MAG) instrument, i.e. resampled space magnetic field in nanoTesla and in VSO coordinates. The time resolution is 4sec, resampled from 1Hz calibrated data. Full data-coverage 24 hr per day is available with only few data-gaps. The basic data were collected during the Venus Express THIRD EXTENSION of the mission from 22 Aug 2010 to the end of them third extension (2011 August). The basic data is comprised of uncalibrated raw measurement data, calibrated data, resampled data and geometry information. Also included documentation. DATA CONTENTS: ------------- HOUSEKEEPING data: NO HK data (temperatures, voltages) are injected into the archive, since they are NOT used for calibration. They are stored at IWF and are used for monitoring the health of the instrument. Since this is in perfect order, NO HK data were used for calibration. MEASUREMENT data: CODMAC 2 level (=RAW SENSOR DATA) are RAW data. Only known sensor effects are corrected; these RAW data contain a significant amount of variable spacecraft background field. 1) CODMAC 2 level (=RAW SENSOR DATA) in-flight data products with 1 Hz data resolution, i.e. 'Solar wind mode', are available for the whole mission duration (after Venus orbit insertion, 12 April 2006) and nearly without data-gaps, since MAG is ON in principle at ALL times. To obtain continuous 1Hz data-coverage, all data intervals of higher data rate are downsampled on ground with the same methods as onboard (see 2.2.4) and merged into the 1 Hz data set, to enable a full coverage with equidistant samples in time. 2) CODMAC 2 level in-flight data products with 32 Hz data resolution are available for short time intervals (2x10 mins to 2x2 hours) around pericenter after start of the nominal mission (14 May 2006) Data intervals of higher data rate are down-sampled with the same .. methods as onboard (see 2.2.4) and merged into the 3...2 Hz data set. 3) CODMAC 2 level in-flight data products with 128Hz data resolution are available for short time intervals (several minutes) around pericenter after start of the nominal mission (14 May 2006) DIRECTORY NAMING CONVENTIONS: ---------------------------- In the DATA-directory, data are archived according to different phases from the flight before the Venus Orbit Insertion. After Venus orbit injection, data directories are archived according to DATA PHASE NAME, which is according to DATE and not according to orbit numbers. Therefore, all DATA-directory-names contain a 'DATA PHASE NAME', as defined in Table below, and an indication of the data- or time-resolution of the data. ------------------------------------------------------------------ DATA_PHASE_NAME | DATA_PHASE_NAME_ID in | DATA-Directory-names ------------------------------------------------------------------ | 'XXXXXXXXX' 'Commissioning at Earth' | 'COMMEARTH' 'Cruise Phase year month' | 'CRU200601' | 'CRU200602' | 'CRU200603' 'Capture Orbit at Venus' | 'CAPTORBIT' 'Commissioning at Venus' | 'COMMVENUS' 'Orbit at Venus year month' | 'ORB200605' | 'ORB200606' etc. | ------------------------------------------------------------------ No directory name is longer than 32 characters and the data directory has the following structure: |--- DATA |--- XXXXXXXXX_ZZZZ Filename1 per DOY Filename2 per DOY Etc. |--- XXXXXXXXX_ZZZZ where: XXXXXXXXX : DATA_PHASE_NAME_ID ZZZZ : denotes the data-rate or resolution of the data in the files. DZZZ : denotes the DATA-rate of the data in the file for the products RAW_SENSOR_DATA CALIBRATED_DATA values are according to the sheme: D001 for 1 Hz data-rate D032 for 32 Hz data-rate (only for CODMAC 2 ) D128 for 128 Hz data-rate (only for CODMAC 2 ) RZZZ : denotes the DATA-rate in the file for the product RESAMPLED_CALIBRATED_DATA values are according to the sheme: SZZZ (Resolution in ZZZ Seconds) MZZZ (Resolution in ZZZ Minutes) HZZZ (Resolution in ZZZ Hours) FILE NAMING CONVENTIONS: ------------------------ This is the MAG file-naming convention for the data-files in the DATA-sub-directories. File-names are NOT longer than 31 digits, ie. name(<=27).ext(3) (PDS standard). All data are archived in ASCII-files. 1) Data Product RAW_SENSOR_DATA : = Raw synchronized sensor data, CODMAC Level 2: Position: 123456789012345678901234567.123 Filename: BIO_YYYYMMDD_DOYXXX_DZZZ_VN.TAB where YYYYMMDD : date XXX : day of the year DZZZ : denotes the DATA-rate of the data in the file, where D is used for original data-rate files from the S/C; values are according to the sheme: D001 for 1 Hz data-rate D032 for 32 Hz data-rate (only for CODMAC 2 ) D128 for 128 Hz data-rate (only for CODMAC 2 ) N : Version number Example: BIO_20061115_DOY319_D001_V1.TAB 2) Data Product CALIBRATED data: = Space magnetic field data, CODMAC Level 3: Position: 123456789012345678901234567.123 Filename: MAG_YYYYMMDD_DOYXXX_DZZZ_VN.TAB where YYYYMMDD : date XXX : day of the year DZZZ : denotes the DATA-rate of the data in the file, where D is used for original data-rate files from the S/C; values are according to the sheme: D001 for 1 Hz data-rate N : Version number Example: MAG_20061115_DOY319_D001_V1.TAB 3) Data Product RESAMPLED CALIBRATED DATA: = Resampled space magnetic field data , CODMAC Level 4: Position: 123456789012345678901234567.123 Filename: MAG_YYYYMMDD_DOYXXX_RZZZ_VN.TAB where YYYYMMDD : date XXX : day of the year RZZZ : denotes the DATA-rate of the data in the file, with possibilities: (same as defined above for the directory names) SZZZ (Resolution in ZZZ Seconds) MZZZ (Resolution in ZZZ Minutes) HZZZ (Resolution in ZZZ Hours) N : Version number Example: MAG_20061115_DOY319_S004_V1.TAB
Instrument MAG
Temporal Coverage 2010-08-22T00:00:00Z/2014-11-27T08:29:58Z
Version V1.0
Mission Description Mission Overview Venus Express is ESA's first mission to Venus. It reuses the design of the Mars Express spacecraft. Many of the instruments are simply upgraded versions of those developed for ESA's Mars Express and Rosetta missions. The scientific objectives of the mission is to study the atmosphere, the plasma environment, and the surface of Venus in great detail. Venus Express was launched by a Soyuz-Fregat launcher from the Baikonour Cosmodrome on 9 November 2005. After separation, Venus Express, of mass 1244 kg,was placed into an interplanetary transfer orbit during approximately 150 days. After a 153 day cruise to Venus the spacecraft entered Venusian orbit on 11 april 2006. The first capture orbit was an eccentric polar and lasted 9 days. Several manoeuvres over the period 15 April-6 May 2006 lowered the spacecraft into its operational orbit: a 24-hour elliptical, quasi-polar orbit. The pericentre altitude is 250 kms and the apocentre altitude is 66000 kms. Pericentre altitude 250 km Apocentre altitude 66000 km Period 24 h Inclination ~90 deg Pericentre latitude 80 deg The mission has been described in many papers [ESA2005; HUNTER2004]. Details about the mission launch sequence and timeline can be obtained from the Mission Calendar [DAUVIN2005] and from the Consolidated Report on Mission Analysis (CREMA) [SANCHEZ&RODRIGU2005]. Mission Phases The mission timeline defines the different spacecraft and payload operations required per phase to prepare the spacecraft for Venus operational orbit acquisition, science data acquisition and transmission. Six nominal mission phases plus the pre-launch phase are defined for achieving the scientific mission objectives. They are detailed below. PRELAUNCH --------- Pre-launch operations started approximately 6 months before the launch and covered the period from delivery of the spacecraft to the launch site until L-8 hrs in the launch countdown... sequence. During this period the Venus Express Mission Operations Centre (VMOC) at ESOC performs its final simulation programme including the validation of the Flight Operations Plan (FOP) and the final mission control system. mission phase start time : UNK mission phase stop time : 2005-11-09 LAUNCH AND EARLY ORBIT PHASE (LEOP) ----------------------------------- The Venus Express spacecraft was launched on a Soyouz-Fregat rocket from the Baikonur Cosmodrome at 3:33:34 UT on 9 November 2005. The three-stage Soyuz launcher lifted the Fregat autonomous upper stage (fourth stage) with Venus Express mounted on it into a sub-orbital trajectory. After separation from the Soyuz third stage, a Fregat main engine burn (at an altitude of about 200 kilometres) for around 20 seconds placed the Fregat-Venus Express composite into an almost circular parking orbit. After a coast phase of about 70 minutes in the low Earth orbit, a second Fregat engine burn, lasting 16 minutes, moved the combined craft from the parking orbit onto an escape trajectory, after which the Fregat stage and Venus Express separated. Duration : 3 days mission phase start time : 2005-11-09 mission phase stop time : 2005-11-11 After separation, Venus Express spent approximately 150 days in an interplanetary transfer orbit. During this phase, trajectory corrections were performed using the spacecraft's own thrusters. NEAR EARTH COMMISSIONING PHASE (NECP) ------------------------------------- It includes the following activities for the spacecraft: - spacecraft commissioning. - deployment of the MAG Boom. - Payloads commissioning. Duration : 3 weeks mission phase start time : 2005-11-12 mission phase stop time : 2005-12-16 INTERPLANETARY CRUISE PHASE --------------------------- The Interplanetary Cruise Phase finishes about one month before Venus capture. During this 3 months phase, the spacecraft in on the Sun-centred ballistic orbit to Venus. Most of this phase is not dedicated to any specific activity, except the cruise orbit determination and correction. Duration : 107 days mission phase start time : 2005-12-17 mission phase stop time : 2006-04-04 VENUS ORBIT INSERTION PHASE (VOI) --------------------------- The Venus Orbit Insertion (VOI) phase is the period of transition between the Interplanetary Cruise phase and the final operational orbit around Venus. It starts before the Venus capture manoeuvre and ends when the satellite has reached the operational orbit. The duration of this phase is about 2 weeks. A final course adjustment was performed on 29 March to fine tune the arrival hyperbola for Venus Orbit Insertion. The VOI manoeuvre took place on 11 April 2006. To enable capture of the spacecraft, it was first slewed such that the main engine was aligned to the direction of travel. The main engine burn lasted around 50 minutes and decelerated the spacecraft by approximately 1251 ms-1 (~ 4500 kmh-1). The spacecraft initially entered a highly elliptical polar orbit with a pericentre of 400 km, an apocentre of 350 000 km and a period of 9 days. To achieve the final operational orbit a series of correction manoeuvres are necessary: Date Activity Velocity Change (m/s) 15 April 2006 Pericentre Control Manoeuvre #1 5.8 20 April 2006 Apocentre Lowering Manoeuvre #1 199.9 23 April 2006 Apocentre Lowering Manoeuvre #2 105.3 26 April 2006 Apocentre Lowering Manoeuvre #3 9.2 29 April 2006 Apocentre Lowering Manoeuvre #4 8.0 2 May 2006 Apocentre Trim 2.0 6 May 2006 Pericentre Control Manoeuvre #2 3.1 Duration : 16 days mission phase start time : 2006-04-05 venus capture manoeuvre : 2006-04-11 mission phase stop time : 2006-04-21 VENUS ORBIT COMMISSIONING PHASE --------------------------------- The Venus Payload Commissioning phase starts when the spacecraft has reached the operational orbit and ends when it is declared ready for science data acquisition and transmission to the Earth. It is dedicated to spacecraft commissioning activities, payloads commissioning and demonstration activities prior to operational science operations. The duration of the Payload Commissioning phase around Venus is about 1 month. The operations to be performed during the phase are the following: - S/C in-orbit commissioning, - Payloads in-orbit commissioning, - Isolation of the Propulsion system. Duration : 42 days mission phase start time : 2006-04-22 mission phase stop time : 2006-06-03 ROUTINE OPERATIONS PHASE ------------------------ The selected operational orbit is inertially fixed, so that coverage of all planetocentric longitudes will be accomplished in one Venus sidereal day (243 Earth days). The nominal mission orbital lifetime is two Venus sidereal days (486 Earth days). It consists in science data acquisition from the payloads, data storage in the SSMM and data transmission to the Earth. There are two different phases of operations for Venus Express once it is in operational orbit: the Earth Pointing phase and the Observation phase. The Earth pointing phase is dedicated to communication with Earth and battery charging. It is used whenever the spacecraft is not in the observation phase. In the Earth pointing phase, one of the two High Gain Antennas is oriented towards Earth. The antenna is selected according to the season, so that the spacecraft's cold face remains always protected from illumination by the Sun. The rotation angle around the Earth direction is optimised in order to avoid any entrance of Sun light on the side walls radiators. High rate communication will be performed 8 hours per day in X-band, in order to transmit to Earth all science data stored in the Solid State Mass Memory. An average of 2 Gbits of science data will be downlinked every day to the new ESA ground station of Cebreros, Spain. The observation phase consists of several different modes of observation, depending on the payload configuration and spacecraft orientation: Nadir pointing, Limb observation, Star occultation, Radio science. During observation, the Sun can illuminate under transient conditions any spacecraft face, except for the cold face. The duration of observation is therefore limited by thermal constraints and by battery discharge. The maximum duration of an observation period depends on the Sun direction with respect to the orbit plane, which varies along the mission. Observations and spacecraft activities are planned based on the following principles: 1. Complete and uniform the coverage of the science themes 2. Balance between distant and close-up view of Venus 3. Balance between observations of the Northern and Southern hemisphere 4. Synergy between experiments in covering science objectives 5. Use of two cases in each orbit: one in apocentre, one in pericentre 6. Even distribution of pericentric cases with priority given to the solar and Earth radio occultation experiments in speific seasons 7. Apocentric cases (2,3) are grouped in campaigns of 10 orbits that is required by the atmospheric dynamics mission objectives 8. Maximum compliance with the current flight rules. Individual Objectives per Instrument ------------------------------------ ASPERA On during the entire mission and permanently collecting data. Survey observations in the beginning of the mission and more specific and detailed observations on selected part of the orbit later in the mission. Data is collected at different rates depending on the selected mode. MAG On during the entire mission and permanently collecting data. Data is collected at different rates depending on the selected mode. SPICAV The main goal of SPICAV is to sound the Venus atmosphere in solar and stellar occultation geometry with sufficient latitude and local time coverage. SPICAV does also nadir and corona observations (90 deg slew from nadir pointing and back to nadir). VeRa 4 types of observations 1. Earth occultation with as good as possible latitude and local time coverage of Venus. 2. Bi-static sounding of surface targets. The radio signal is sent to selected targets on the Venus surface. Reflected and scattered signal is received by ground station. As the signal is weak, the experiment depends on the Earth Venus distance, geometry and surface target properties. 3. Solar Corona observations in vincinity of conjunctions. 4. Gravity anomaly. It consists in the precise tracking of the s/c while it passes over global geological formations on Venus solid body. It has been carried out only twice during the nominal mission . Duration : 486 days mission phase start time : 2006-06-04 mission phase stop time : 2007-10-02 EXTENDED OPERATIONS PHASE ------------------------- The nominal mission ended on October 2, 2007 when started the first extended mission. The first extended mission phase was approved until May 2009, end of MTP 040, May 30th, orbit 1135. It is followed by the second mission extenstion from MTP 041 that starts in May, 31 2009 (orbit 1136). The second extension is followed by the third extension that starts with MTP 057, August 22nd 2010, orbit 1584. The third extension ends with MTP 085 in December 2012. Summary of extended mission phase --------------------------------- NOMINAL MISSION MTP 002 Day 4 June 2006 Orbit 44 EXTENSION 1 MTP 019 Day 3 October 2007 Orbit 530 EXTENSION 2 MTP 041 Day 31 May 2009 Orbit 1136 EXTENSION 3 MTP 057 Day 22 August 2010 Orbit 1584 EXTENSION 1, 2, 3: General Observation strategy ----------------------------------------------- The first extended mission has the following objectives: - Improve and complete spatial and temporal observational coverage - Study in detail the phenomena discovered in the nominal mission - Take advantage of the new operation modes (case #2 pendulum, spot pointing, ...) - Perform percentre lowering down to the altitude that still allows usual operations without entering aerobraking mode (around 170-270 km) - Perform necessary studies and tests preparing te spacecraft for future aerobraking campaign These goals determine the following planning outline for the extended mission: - October 3, 2007 - May 31, 2008 (MTP 19-27): like nominal mission - June 2008 - TBD operations with low pericentre. - TBD: Aerobraking campaign. Pericentre lowering campaign: The pericentre altitude was maintained between 250 km and 350 km during the first 8 months of the extended mission. After May 31, 2008 the pericentre was lowered to the corridor 170-220 km. This pericentre lowering aimed at observing plasma at this altitude range. The apocentre and the pericentre latitude hasn't changed (66000 km, about 78 deg). Science Subphase ---------------- For the purpose of structuring further the payload operations planning, the mission phases are further divided into science subphases. Phase number Date Orbit CRUISE 2005-11-09 -1 VOI 2006-04-11 0 PHASE 0 2006-05-14 23 PHASE 1 2006-06-04 44 PHASE 2 2006-07-11 82 PHASE 3 2006-09-14 146 PHASE 4 2006-11-16 209 PHASE 5 2007-02-01 286 PHASE 6 2007-03-16 330 PHASE 7 2007-04-25 370 PHASE 8 2007-06-30 436 PHASE 9 2007-08-21 488 PHASE 10 2007-10-04 531 PHASE 11 2007-10-27 554 PHASE 12 2008-01-04 623 PHASE 13 2008-04-01 711 PHASE 14 2008-06-05 776 PHASE 15 2008-08-01 833 PHASE 16 2008-09-23 886 PHASE 17 2008-12-31 985 PHASE 18 2009-03-02 1046 PHASE 19 2009-05-05 1110 PHASE 20 2009-06-24 1160 PHASE 21 2009-09-20 1248 PHASE 22 2009-10-18 1276 PHASE 23 2009-12-17 1336 PHASE 24 2010-02-02 1383 PHASE 25 2010-04-07 1447 PHASE 26 2010-05-30 1500 PHASE 27 2010-07-12 1543 PHASE 28 2010-07-30 1561 PHASE 29 2010-09-14 1607 PHASE 30 2010-11-19 1672 PHASE 31 2011-01-17 1732 PHASE 32 2011-03-23 1797 PHASE 33 2011-04-26 1831 PHASE 34 2011-06-14 1880 PHASE 35 2011-08-27 1954 PHASE 36 2011-10-25 2013 PHASE 37 2011-12-05 2054 PHASE 38 2012-01-08 2088 VOI and Phase 0 ------- This initial phase is devoted to the spacecraft and payload checkout and in orbit commissioning. The phase will consist of: - experiments commissioning (until 14 May 2006, orb 23). - Science case commissioning (16-27 May 2006, Orb 23-36). - Extended case commissioning (May 28-June 3, Orb 37-43). The ECC will also occupy the first half of phase 1. The phase contains the first eclipse season that ends at orbit 40. VOI --- Dates : April 11 - May 13 2006 Orbits : 1 - 23 Phase 0 ------- Dates : May 14 - June 03, 2006 Orbits : 23 - 43 Phase duration : 20 days MTP : 1 Phase 1 ------- Phase 1 is favorable for observations of the evening terminator vicinity. In particular, the following observation are performed: - Cloud observations; - lightning on the night side; - stellar occultation on the dark limb (north/south asymmetry of the aerosol vertical structure); - Solar occultation (horizontal structure of hazes above the main cloud deck); - Thermal mapping of Ishtar Terra and Maxwell Montes; - Limb observations (vertical structure of haze layers); - Observations of nightglows (O2, NO ...), their latitude and vertical variability; - Bistatic sounding of the Maxwell Montes (BSR#1) - Comet Mrkos by SPICAV and VMC on June 5, 2006. SPICAV observe nadir and stellar occultations. VeRa perform bi-static sounding (BSR#1) of Maxwell Montes. VIRTIS observe the evening sector of the planet, night side mosaics, thermal mapping of Maxwell Montes and limbs. VMC observe the evening sector of Venus, limbs and perform thermal mapping of Maxwell Montes. Dates : June 4 - July 10, 2006 Orbits : 44-81 Phase duration : 37 days MTP : 2-3 Phase 2 ------- Phase 2 starts at the beginning of the first Earth occultation season in orbit 81 and ends at the end of the 2nd eclipse season in orbit 145. It provides favorable conditions for nadir observations of the night side. The following observations have the priority: - Solar occultations; - Earth radio-occultations; - Night side dynamics with high spatial resolution - Twilight limb observations in forward scattering geometry - Nightglow observations - Thernal mapping of the surface The night side surface targets are Beta Regio, Theia Mons, Phoebe Regio, Ishtar Terra (Lakshmi Planum). ASPERA take measurement of the night side plasma. SPICAV observe in nadir mode and the solar occultations. VeRa observe during the Earth occultation season #1 and participate in the gravity campaign #1. VMC observe the night side: atmopsheric dynamic, night side surface mapping of the targets listed above. They observe also nightglow and they search for lighting. Dates : July 11 - September 13 2006 Orbits : 81 - 145 Phase duration : 64 days MTP : 3-5 Phase 3 ------- The Venus dark side could be observed in the beginning of Phase 3. Phase 3 will also have conditions for systematic observations of the morning/evening terminator and for solar corona studies. The phase contains the first superior solar conjunction (orbit 179-201). The following observations are performed: - Cloud at terminator (study of cloud and haze structure); - Coordinated campaign of atmospheric dynamics observations in Northern and Southern polar regions; - Search for lighting on the night side; - Double stellar occultation on the dark limb (north-south assymetry of aerosol vertical structure); Mapping of surface targets (Isthar Terra); - Limbs (vertical structure of haze layers); - Nightglows (O2, NO...): latitude and vertical variability; - Solar Corona studies; - Gravity anomaly #1 ASPERA observe the morning sector. SPICAV observe nadir and stellar occultations. VeRa observes the Solar Corona and do the 1st gravity anomaly campaign. VIRTIS observe the north/south polar dynamics, the Ishtar Terra night side target and the morning sector. VMC observe the north/south polar dynamics, the Ishtar Terra night side target, the high-resolution atmospheric dynamics and the nightglow and search for lightning. Dates : September 14, 2006 - November 15, 2006 Orbits : 146 - 208 Phase duration : 62 days MTP : 5-7 Phase 4 ------- Phase 4 starts at the beginning of the eclipse season in orbit 209 and ends at the end of the Earth occultation season in orbit 285. ASPERA observe in details the nightside plasma. SPICAV observe solar occultations and in nadir mode. VeRa observe during Earth occultation season and Solar Corona. VIRTIS and VMC observe on the dayside but also nightside of Theia Mons and Lakshmi Planum. Dates : November 16, 2006 - January 31, 2007. Orbits : 209 - 285 Phase duration : 76 days MTP : 7-10 Phase 5 ------- Phase 5 starts at the end of the Earth occultation season #2 and ends at the beginning of the eclipse season #4. It has favorable conditions for observations of the evening terminator. Focus is also made on the night side. The following observations are performed: - Cloud observations at terminator (study of cloud and haze structure); - North-South atmospheric dynamics; - Search for lightning on the night side; - Double stellar occultation on the dark limb (north-south assymetry of aerosol vertical structure); - Mapping of surface targets: Atla Regio, Ozza Mons; - Limbs (vertical structure of haze layers); - Nightglows (O2, NO...): latitude and vertical variability; ASPERA observe in details the evening sector. SPICAV observe nadir and stellar occultation. VeRa do not observe anything. VIRTIS and VMC do mosaic and off pericentre observations. They participate in the North/South pole dynamics campaign. They also observe the night side. Dates : February 1 - March 15, 2007. Orbits : 286 - 329 Phase duration : 43 days MTP : 10-12 Phase 6 ------- Phase 6 starts at the beginning of the eclipse season #4 in orbit 330. It ends with the same season in orbit 369. The phase provides good conditions for observations of the night side and atmospheric sounding in solar occultation geometry. Solar occultations are used to study composition and structure of the atmosphere above the cloud top. Campaigns of off-pericentre observations and apocentre VIRTIS mosaic are used to study composition and dynamics of deep atmosphere on the night side. Conditions will be also favourable for observations of nightglows to study composition and dynamics of the thermosphere and search for lightning. Limb observations in forward scattering geometry (spacecraft in eclipse) will provide good opportunity to study vertical structure of hazes above the main cloud. Thermal mapping of the surface and search for active volcanism is performed. One bi-static sounding experiment (BSR #4) is scheduled. The night side surface targets are Beta Regio, Theia Mons and Phoebe Regio. SPICAV observe nadir and Solar occultations. VeRa do the bi-static sounding experiment #4. VIRTIS and VMC observe off-pericentre and in mosaic mode. They observe Themis and Phoebe Regio on the night side. Dates : March 16 - April 24, 2007. Orbits : 330 - 369 Phase duration : 39 days MTP : 12-13 Phase 7 ------- Phase 7 starts with the Earth occultation season #3 in orbit 370 and ends with it in orbit 435. Proximity to the Earth creates excellent conditions for bi-static sounding and radio-occultation experiment that can reach maximum sounding depth. It is used to study the atmosphere with high spatial resolution. As earlier in phases 1, 3, 5 the terminator sector of the planet is available for observations in this phase. Cloud structure and atmospheric dynamics are important goals. The night side surface targets are Gula and Sif Mons, Guinevere Planitia, Ishtar Terra, Atalanta Planitia, Atla Regio and Ozza. SPICAV observe nadir and stellar occultations. VeRa is on during the radio occultation season 4 and perform the bi-static radar experiment #5 (Ozza Mons). VIRTIS and VMC do off-pericentre and mosaic observations. They observe Ishtar Terra and Maxwell Montes on the night side. Dates : April 25 - June 29, 2007. Orbits : 370 - 435 Phase duration : 65 days MTP :13-15 Phase 8 ------- Phase 8 starts and ends with the eclipse season #5 (orbit 436-487). Thus significant portion of orbits will be devoted to solar occultation observations. This phase is favourable for investigation of dayside dynamics. Proximity to the Earth provides good conditions for solar corona studies and bi-static sounding. Gravity #2 target is Atalanta Planitia, which was poorly covered by the Magellan observations. The thermal mapping covers Beta Regio, Phoebe Regio. SPICAV observe nadir and solar occultation. VeRa do the gravity #2 experiment and bi-static radar sounding #6 (Beta Regio and Theia Mons). VIRTIS and VMC do off-pericentre and mosaic observations of the dayside. Dates : June 30 - August 20, 2007. Orbits : 436 - 487 Phase duration : 51 days MTP : 16-17 Phase 9 ------- Phase 9 contains the Earth occultation season #4. It is favourable for observations of the vicinity of evening terminator. By the end of this season conditions for the off-pericentre night side observations is fulfilled. Main scientific focus of this phase is to provide observations of the evening terminator. The following observations are carried out: - Cloud observations at terminator (study of cloud and haze structure); - Search for lightning on the night side; - Double stellar occultation on the dark limb (north/south asymmetry of the aerosol vertical structure); - Grazing solar occultation (horizontal structure of the hazes above the main cloud deck); - Mapping of the surface targets; - Limb (vertical structure of haze layers); - Nightglows (O2, NO) and their latitude and vertical variability. The night side surface targets are Atalanta Planitia, coronae, Guinevere Planitia and Ishtar Terra. SPICAV observe nadir and stellar occultation. VeRa do the bi-static radar sounding #6a. VIRTIS and VMC observe the morning and evening sectors. Dates : August 21 - October 3, 2007. Orbits : 488 - 530 Phase duration : 42 days MTP : 17-19 Phase 10 -------- Phase 10 has no eclipse or occultation seasons. A routine sequence of off-pericentre observations followed by Nadir, limb or stellar occultations are carried out. The night side surface targets are Atla Regio (Sapas, Maat, Ozza Mons), Zemina corona. SPICAV SOIR does not make any observation during this phase (no occultations). Dates : October 4 - October 26, 2007. Orbits : 531 - 553 Phase duration : 22 days MTP : 19-20 Phase 11 -------- Phase 11 starts with the eclipse season #6 in orbit 554. However, solar occultations is only possible from orbit 576 to 596 because of the temperature conditions due to the sun position. VIRTIS perform some airglow campaign in nadir and limb geometry. VMC observe the surface on the night side. The observation targets are Asteria Regio, Hinemoa, Gunda and Kawelu Planitia, Beta Regio (Rheja and Theja Mons) and Phoebe Regio. SPICAV will observe stars at large distance, later in the phase. Two spot pointings are performed in orbit 561 and 571 (study of cloud scattering phase function). Gravity measurements are performed over Atalanta Planita in orbits 615, 617, 619, 621. Meteors occur in orbit 555. Despite the solar occultation that begins 27th October 2007, SOIR does not make any observation neither calibration until 25th November 2007, due to thermal reasons in Quadrature period. Dates : October 27, 2007- January 3, 2008. Orbits : 554 - 622 Phase duration : 68 days MTP : 20-22 Phase 12 -------- Phase 12 starts with Earth occultation season # 5 and ends with the eclipse season # 7. Earth occultation season begins in orbit 623 and ends in orbit 692. Pendulum observations are performed during all this phase. From orbit 659 to orbit 680, three periods overlap: Earth occultations, Eclipse season, solar opposition. The solar opposition is favorable for apocentre mosaics by VIRTIS. The surface targets for this phase are Atahensik and Zimina Coronae, Atla Regio (Ozza Mons) and East from it and Atalanta Planitia. VIRTIS near-IR do temperature sounding in the same region. Then cross-correlation on results are made possible. From orbit 612 to 631 there is the VIRTIS apocentre mosaic season. Solar occultations and pendulum observations are mainly performed at the end of the phase (from orbit 690). VeRa have the priority for pericentre observations of the Southern Hemisphere. However, VeRa measurements are not possible from orbit 645 to 658 for NNO maintenance. Dates : January 3 - March 31, 2008. Orbits : 623 - 710 Phase duration : 87 days MTP : 22-25 Phase 13 -------- There is no specific season during most of phase 13. During this phase, pericentre observations, stellar occultation observations, limb observations at pericentre are performed. At the end of the phase 13, in orbit 769, the mission enters superior conjunction phase and telecommunication outage period (orbit 769 to 790) during which all science operations are suspended. Dates : April 1 - June 4, 2008. Orbits : 711 - 775 Phase duration : 64 days MTP : 25-28 Phase 14 -------- Phase 14 starts with the eclipse season #8 and Earth occultation season #6. At the beginning of the phase, the superior solar conjunction prevent any science observations. The eclipse and Earth occultation seasons overlap (orbit 777-821). The Earth occultation period lasts longer up to orbit 832. The targets for the surface observations are East flank of Atla Regio, Ozza Mons, Zevana and Paga Chasma. During this phase, there is a pericentre lowering campaign in orbits 814, 815, 821, 822, 829 and 830. VMC perform surface imaging and wind tracking. SPICAV do solar occultations (ingress and egress solar occultations in orbits 811-819), night and plane limbs and UV observations of the exosphere on the day side. Stellar occultations may be performed in coordination with VeRa. They observe dayglow when flying perpendicular to terminator. Possibly sub-solar point tracking may be performed by SOIR. VIRTIS perform night limbs together with SPICAV and surface imaging. The VeRa Earth occultation experiments begins in orbit 817. Dates : June 5 - July 31, 2008. Orbits : 776 - 832 Phase duration : 56 days MTP : 28-30 Phase 15 -------- There is no specific season during phase 15. The pericentre lowering campaign that began in the previous phase ends at orbit 836 and occur in orbits 836 and 837. SPICAV perform night limbs, plane limbs and stellar occultations. Laterin the phase, SPICAV perform day side limbs. VMC perform wind tracking on the day side. VIRTIS do night side and terminator monitoring and limb observations together with SPICAV at the beginning of the phase. Later in the phase, day side and terminator monitoring is performed. Dates : August 1 - September 22, 2008. Orbits : 833 - 885 Phase duration : 52 days MTP : 30-32 Phase 16 -------- This phase starts with Eclipse season (orbit 866 - 934). During phase 16, there is also a Mosaic season (orbit 903 - 969) and the Earth occultation season #7 (orbit 921 - 985). Pendulum observations are frequently used. There is a joint VIRTIS-SPICAV campaign of night side nadir airglow observations in equatorial zone. There is good opportunity for SOIR nadir observations. SPICAV perform solar occultation and limb observations. VMC perform monitoring, wind tracking on the day side, surface imaging between solar occultations. Around orbit 967, they perform night side imaging of Aphrodite Terra. VIRTIS perform day side monitoring, limb observations together with SPICAV. Later in the phase, VIRTIS also perform Mosaic at apocentre. VeRa perform radio occultations. Dates : September 23 - December 31, 2008. Orbits : 886 - 985 Phase duration : 99 days MTP : 32-35 Phase 17 -------- This phase starts with the end of the Earth occultation season. On orbit 1001 starts a new eclipse season. The mission ends at the end of the Eclipse season, at orbit 1045. SPICAV will observe day and night limbs and do Solar Occultations. VMC will observe night side imaging of the Aphrodite Terra (Ovda Regio, Atla Regio, Sapas Mons, Ganis Chasma) and Rusalka Planitia. VeRa will do radio observation. VIRTIS do observations every second orbit. Dates : January 1 - March 1, 2009. Orbits : 986 - 1045 Phase duration : days MTP : 35-37 Phase 18 -------- This phase includes inferior conjunction. There is no specific season. It focuses on the Venus morning sector. Every second orbit coordinated campaign of ground based observations are organised. SPICAV will observe stellar occultations and day side tangential limbs. VMC will do wind tracking in the evening sector and night side imaging of the western part of Aphrodite Terra (Ovda Regio, Monatum and Tellus Tessera, Tahmina and Aino Planitia). VIRTIS will do terminator studies, limb observations with SPICAV and night side surface observations with VMC. VeRa will do gravity experiment. Dates : March 2 - May 4 , 2009. Orbits : 1046 - 1109 Phase duration : days MTP : 38-39 Phase 19 -------- This phase starts with the Eclipse season (#11), at orbit 1110. It ends when the Eclipse season ends, at orbit 1159. The day side observations have good illumination conditions. The night side surface observations are in eclipse. SPICAV will observe solar and stellar occultations as well as day side tangential limbs. VMC will do day side observations and night side imaging of the Atlanta and Rusalka Planitia and of Atahensik corona. VIRTIS will observe on the day side and limb observations with SPICAV. Dates : May 5 - June 23 , 2009. Orbits : 1110 - 1159 Phase duration : days MTP : 40-41 Phase 20 -------- This phase starts at the end of the Eclipse season (#11), at orbit 1160. It ends after the end of the Earth occultation season (#7) and during the following Eclipse season (#12). VeRa observe during the Earth occultation season and is given the priority. Night side surface targets: Llorona Planitia and Aphrodite Terra. SPICAV do nadir observations around terminator (SO2), solar occultation before pericentre, exospheric limb observation after pericentre. VMC observe night limb (O2 emission and surface) before pericentre and day side nadir after pericentre. They observe in spot pointing mode (see VEX_POINTING_MODE_DESC.TXT) for phase function studies (study of the same place with different light conditions). They also do VMC mosaic (see INSTRUMENT_MODE_DESC.TXT). VIRTIS-H observes meridional cross-sections. Dates : June 24 - Septembre 19 , 2009. Orbits : 1160 - 1247 Phase duration : days MTP : 41-44 Phase 21 -------- This phase starts during the Eclipse season #12, at orbit 1248. During the Eclipse season, the night side of the surface is observed. At the end of the phase (orbits 1271-1275) there is the Drag Campaign #2, meaning that the pericentre pass is devoted to the spacecraft tracking by NNO and no observations within +/- 2 hours from the pericentre are foreseen. SPICAV SOIR is given the priority in pericentre observations. SPICAV observe solar occultation. They do a campaign of nadir night side observations (NO emission). They also observe exospheric limbs. VMC observe day side nadirs. They do mosaic and spot pointing for phase function studies (see phase 20). VeRa do gravity measurements . VIRTIS observe meridional cross sections of the night side. Dates : September 20 - October 17 , 2009. Orbits : 1248 - 1275 Phase duration : days MTP : 45 Phase 22 -------- This phase does not contain any peculiar season. It ends just at the beginning of the Earth occultation season (orbit 1335). The observations focus on the morning sector of the planet. In orbit 1332, there is an OCM. SPICAV follow their previous nadir night side campaign of NO emission. They also do nadir observations of SO2 around terminator. VMC do day side observations with off-track (see explanation above). They also observe night limbs. VIRTIS observe meridional cross-sections. Dates : October 18 - December 16 , 2009. Orbits : 1276 - 1335 Phase duration : 99 days MTP : 46-47 Phase 23 -------- This phase starts at the beginning of the Earth occultation season #13 (orbit 1336). It contains both Earth and solar occultations , but Earth cannot be made due to conjunction. From orbit 1359 to 1378, no science is performed due to telecommunication outage. SPICAV do solar occultations and exospheric limbs. VMC observe in pendulum mode and day side with off-track. pendulum because the observation points to Nadir, then out to space, then back to Nadir, then back to space, etc., mimicking a pendulum movement. VIRTIS observe meridional cross sections. VeRa do not observe due to proximity of the conjunction. Dates : December 17 2009 - February 1 , 2010. Orbits : 1336 - 1382 Phase duration : days MTP : 48-49 Phase 24 -------- This phase has neither Earth nor solar occultations. It starts at the end of the eclipse season (orbit 1382) and ends with the start of the new eclipse season (orbit 1447). The evening sector of the planet is observed. Drag campaign #3 is scheduled for the orbits 1395-1457 and is mainly contained in this phase. A pericentre OCM is scheduled in the orbit 1402 and another one in the orbit 1430. SPICAV observe stellar occultations and limbs with short pendulum every 2 orbit. VMC do pendulum, day side with off track and night limb observations. VIRTIS observe meridional cross sections. Dates : February 2 - April 6 , 2010. Orbits : 1383 - 1446 Phase duration : days MTP : 49-52 Phase 25 -------- This phase starts with the eclipse season #14 at orbit 1447 and ends with it at orbit 1499. During this phase starts the Earth occultation season #9 at orbit 1470. The night side surface of Venus is observed in eclipse. Gravity campaign #11 is scheduled for orbits 1461, 1463 and 1465. An apocentre OCM is scheduled in the orbit 1458. SPICAV observe stellar occultations, solar occultations and exospheric limbs. VMC observe on the day side (latitude tracking, VMC mosaic, spot pointing for cloud phase function). VIRTIS do meridional cross-sections. VeRa perform radio occultations. Dates : April 7 - May 29 , 2010. Orbits : 1447 - 1499 Phase duration : days MTP : 52-53 Phase 26 -------- This phase starts at the end of the eclipse season #14 and ends at the end of the Earth occultation season #9. A pericentre OCM is scheduled in orbit 1500. SPICAV observe stellar occultation, limbs, nadir around terminator (SO2) and Earth. VMC observe on the day side (latitude tracking, VMC mosaic, spot pointing for cloud phase function). VeRa do radio occultations. VIRTIS-H observe meridional cross-sections. Dates : May 30 - July 11 , 2010. Orbits : 1500 - 1542 Phase duration : days MTP : 53-55 Phase 27 -------- This phase focuses on the morning sector of the planet. It starts at the end of the Earth occultation season #9 at orbit 1543 and ends at orbit 1560. The gravity campaign#12 initially scheduled was cancelled. SPICAV observe stellar occultations and limbs. They also observe nadir around terminator (SO2). VMC observe the day side with off track to the day side (latitude tracking, VMC mosaic, spot pointing for cloud phase function). VeRa do radio occultations and the gravity campaign #12, during the Earth occultation season. VIRTIS-H observe meridional cross-sections. Dates : July 12 - July 29 , 2010 Orbits : 1543 - 1560 Phase duration : 36 days MTP : 55-56 Phase 28 -------- This phase includes the eclipse season #15. Solar occultation occur after pericentre. Night surface observations in eclipse covers Thetis Regio of Aphrodite Terra and Llorona and Niobe Planitia. At egress, from eclispes the Artemis corona can be imaged. Surface targets: Thetis Regio, Llorona and Niobe Planitia, Artemis corona. Instrument specific observations: SPICAV do solar occultation observations after orbit 1571. There is some joint SPICAM-SPICAV observations of hydrogen distribution in solar corona. VIRTIS do day latitude track (off pericentre), day side spectroscopy (H) and night limb tracking surface (H) (pericentre). VMC do day side monitoring (off pericentre), latitude tracking, day limb tracking and night limb tracking (pericentre). Dates : July 30 - September 13, 2010. Orbits : 1561 - 1606 Phase duration : 45 days MTP : 56-57 Phase 29 -------- This phase focus on the evening sector of the planet. Drag Campaing #4 (1648-1654) occurs during this phase. After the Drag campaign, the pericenre is raised to 340km. During this phase Venus approaches inferior conjunction. Surface imaging is possible either from apocentre by VIRTIS or a close approach by VMC. Intrument specific observations: SPICAV do solar occultation (pericentre) and stellar occultations (off pericentre). SPICAV SOIR do calibrations and observe aeronomic emissions at pericentre. SOIR calibrations consist in 2 miniscans, 1 alignement and 1 thermal performed in any part of the orbit outside the eclipse. VIRTIS do day latitude track full mosaic (off pericentre) and, at pericentre, day spectroscopy (H) and night limb tracking (H). VMC do day side monitoring and observe terminator (off pericentre) and, at pericentre, latitude day tracking, day limb tracking, and surface out of eclipse. Dates : September 14 - November 18 , 2010. Orbits : 1607 - 1671 Phase duration : 64 days MTP : 57-59 Phase 30 -------- This phase includes Eclipse season #16. It also coincides with Akatsuki's arrival. Akatsuki is a Japanese spacecraft (JAXA) sent on May 20, 2010 to study Venus Atmosphere dynamics. During this phase, solar occultation occurs before pericentre. Surface Targets: Thesis, Ovda Regio of Aphrodite Terra, Tellus Tessera, Niobe and Llorona Planitia, Artemis corona. Instrument specific observations: SPICAV SOIR do calibrations and is given priority in pericentre observations. SPICAV do stellar occultations (off peri) and observe exosperic limb (peri). VIRTIS do day latitude track (off peri) and, at pericentre, spectra and night limb (M). VMC do day side monitoring (off peri) and observe surface and limb in eclipse at pericentre. Dates : November 19, 2010 - January 16, 2011. Orbits : 1672 -1731 Phase duration : 59 days MTP : 60-61 Phase 31 -------- This phase includes Earth occultation #10 and the beginning of eclipse season #17. No solar occultation is possible during this phase. Instrument specific observations: SOIR do calibrations (off peri). SPICAV observe stellar occultations (off peri) and at pericentre, NO emission mapping in nadir, SO2 at terminator. There is also joint SPICAV SPICAM observations. VeRa do radio occultations. VIRTIS do day latitude track off pericentre and at pericentre, limb scans and day spectra. VMC do day side monitoring off pericentre and observe morning sector and evening sector at pericentre. Dates : January 17 - March 22, 2011. Orbits : 1732 - 1796 Phase duration : 64 days MTP : 62-63 Phase 32 -------- This phase includes Eclipse season #17. Surface targets: Ovda and Thesis Regio, Manatum and Tellus Tessera, Niobe and Tahmina Planitia. Instrument specific observations: SPICAV SOIR do calibrations (off peri) and solar occultations (peri). SPICAV do joint observation with SPICAM and stellar occultations (peri). VeRa do radio occultations. VIRTIS do day latitude track off pericentre and spectra and limb scan at pericentre. VMC do day side monitoring off pericentre and, at pericentre, day latitude tracking and surface observations. Dates : March 23 - April 25 , 2011. Orbits : 1797 - 1830 Phase duration : 33 days MTP : 64-65 Phase 33 -------- This phase includes Drag campaign #5. The pericentre is as low as 165 km and is raised to 290 km after the campaign. Instrument specific observations: SPICAV do joint observations with SPICAM off pericetre. At pericentre SPICAV observe nadir for SO2 measurements, do limb observations and stellar occultations. VIRTIS do a full mosaic off pericentre and at pericentre observe day spectroscopy and night limb. VMC observe the terminator off pericentre and, at pericentre, the surface and the limb. Dates : April 26 - June 13 , 2011. Orbits : 1831 - 1879 Phase duration : 48 days MTP : 66-67 Phase 34 -------- This phase includes both Earth occultation season #11 and eclispe season #18. From orbit 1895 to 1907, Venus, Earth and Sun are on one line. Radio and solar occultations sound approximately the same regions on Venus. This creates a rare opportunity for co-located soundings by VeRa and SOIR. Surface targets: Ovda Region, Manatum and Tellus tessera. Instrument specific observations: SOIR perform calibrations off pericentre and solar occultations (peri). SPICAV do joint observations with SPICAM and stellar occultations off pericentre and, at pericentre, observe zodacial light and exospheric limb. VIRTIS do off pericentre day latitude tracking. They observe limb and do M spectral measurement at pericentre. VMC do day side monitoring off pericentre and, at pericentre, they observe the limb and the surface. Dates : June 14 - August 26 , 2011. Orbits : 1880 - 1953 Phase duration : 73 days MTP : 67-69 Phase 35 -------- This phase includes Drag campaign #6. Instrument specific observations: SOIR perform off pericentre calibrations. SPICAV do off pericentre joint observation with SPICAM. They also do stellar occultations off pericentre. At pericentre they do SO2 measurements in nadir modes and at terminator. VIRTIS do day latitude track (off peri). At pericentre they do limb scans and spectral measurements. VMC do day side monitoring at terminator (off peri) and day latitude tracking at pericentre. Dates : August 27 - October 24 , 2011. Orbits : 1954 - 2012 Phase duration : 58 days MTP : 70-71 Phase 36 -------- This phase includes Eclipse season #19 and the first half of Earth occultation #12. Surface targets: Manatum Tessera, Tahmina Platinia, Tellus Tessera, Niobe Planitia and Ovda regio. Instrument specific observations: SOIR perform off pericentre calibrations and solar occultations at pericentre. SPICAV do joint observations with SPICAM and stellar occultations off pericentre. At pericentre, they observe zodacial light. VIRTIS Do off pericentre day latitude track. At pericentre, they do limb scans, measure day spectra. VMC do off pericentre day side monitoring. At pericentre, they do day latitude tracking and observe the surface. Dates : October 25 - December 04 , 2011. Orbits : 2013 - 2053 Phase duration : 40 days MTP : 72- 73 Phase 37 -------- This phase includes the second half of Earth occultation season #12. Instrument specific observations: SPICAV do tangential limb and stellar occultations at pericentre. VeRa do radio occultations. VIRTIS do off pericentre day latitude track and full mosaic. At pericentre, they do day spectroscopy and night limb tracking. VMC do day side monitoring off pericentre. At pericentre they do day latitude tracking and observe the surface. Dates : December 5, 2011 - January 07 , 2012. Orbits : 2054 - 2087 Phase duration : 33 days MTP : 74 Phase 38 -------- This phase includes Drag campaign #7. The pericentre is as low as 165km. Instrument specific observations: SOIR perform calibration off pericentre. SPICAV do off pericentre stellar occultations. At pericentre, they observe nadir mode at terminator and measure aeronomic emissions. VIRTIS do day side tracking off pericentre, 2 full mosaics. At pericentre, they do limb tracking. VMC observe the surface, the limb abd do day latitude tracking at pericentre. Dates : January 8, 2012 - ? Orbits : 2088 - ? Phase duration : ? days MTP : 75-? Eclipse season Eclipse Dates Season # ------------------------------------- 1 | 16 Apr 2006 - 31 May 2006 2 | 6 Aug 2006 - 13 Sep 2006 3 | 16 Nov 2006 - 10 Jan 2006 4 | 17 Mar 2007 - 26 Apr 2007 5 | 29 Jun 2007 - 21 Aug 2007 6 | 27 Oct 2007 - 9 Dec 2007 7 | 9 Feb 2008 - 1 Apr 2008 8 | 6 Jun 2008 - 20 Jul 2008 9 | 23 Sep 2008 - 10 Nov 2008 10 | 16 Jan 2009 - 28 Feb 2009 11 | 5 May 2009 - 23 Jun 2009 12 | 27 Aug 2009 - 17 Oct 2009 13 | 17 Dec 2009 - 1 Feb 2010 14 | 7 Apr 2010 - 29 May 2010 15 | 30 Jul 2010 - 13 Sep 2010 16 | 18 Nov 2010 - 10 Jan 2011 17 | 13 Mar 2011 - 25 Apr 2011 18 | 29 Jun 2011 - 25 Aug 2011 19 | 25 Oct 2011 - 04 Dec 2011 ------------------------------------ Earth occultation Season Occultation Dates Season # ------------------------------------- 1 | 11 Jul 2006 - 30 Aug 2006 2 | 22 Nov 2006 - 31 Jan 2007 3 | 26 Apr 2007 - 1 Jul 2007 3a | 4 Sep 2007 - 18 Sep 2007 4 | 4 Jan 2008 - 13 Mar 2008 5 | 5 Jun 2008 - 1 Aug 2008 6 | 28 Oct 2008 - 31 Dec 2008 7 | 16 Jul 2009 - 19 Sep 2009 8 | 10 Dec 2009 - 8 Feb 2010 9 | 30 Apr 2010 - 11 Jul 2010 10 | 17 Jan 2011 - 22 Mar 2011 11 | 14 Jun 2011 - 25 Aug 2011 12 | 15 Nov 2011 - 06 Jan 2012 ------------------------------------ Solar conjunction (superior) Solar Dates Conjunction # ------------------------------------- 1 | 17 Oct 2006 - 8 Nov 2006 2 | 29 May 2008 - 19 Jun 2008 3 | 26 Dec 2009 - 28 Jan 2010 4 | 06 Aug 2011 - 26 Aug 2011 ------------------------------------- Drag Campaign = DC# | Dates | --------------------------------------- 1 | 01 Aug 2008 - 22 Aug 2008 | 2 | 12 Oct 2009 - 18 Oct 2009 | 3-1 | 22 Feb 2010 - 28 Feb 2010 | 3-2 | 11 Apr 2010 - 16 Apr 2010 | 4(TBC)| 13 Oct 2010 - 25 Oct 2010 | 5(TBC)| 23 May 2011 - 03 Jun 2011 | 6(TBC)| 13 Sep 2011 - 24 Sep 2011 | 7(TBC)| 08 Jan 2012 - 19 Jan 2012 | --------------------------------------- Gravity = Grav# | Dates | --------------------------------------- 1 | 01 Sep 2006 - 10 Sep 2006 | 2 | Cancelled | 3 | 27 Dec 2007 - 02 Jan 2008 | 4 | 09 Mar 2009 - 15 Mar 2009 | 5 | 21 Mar 2009 - 27 Mar 2009 | 6 | 15 Apr 2009 - 19 Apr 2009 | 7 | 27 Apr 2009 - 01 May 2009 | 8 | 25 May 2009 - 31 May 2009 | 9 | 25 Jun 2009 - 01 Jul 2009 | 10 | 01 Oct 2009 - 07 Jul 2009 | 11 | 21 Apr 2010 - 25 Apr 2010 | 12 | 14 Jul 2010 - 20 Jul 2010 | --------------------------------------- Spacecraft events = Event | Dates | ---------------------------------------------------------------| Launch | 09 Nov 2005 | Earth Moon observations | 22/23 Nov 2005 | Pointing Test 1 | 27 Nov 2005 - 04 Dec 2005 | Interference Test | 14 Dec 2005 - 15 Dec 2005 | Pointing Test 2 | 16 Jan 2006 - 21 Jan 2006 | VOI | 11 Apr 2006 | Capture Orbit Observation 0 | 12 Apr 2006 | Capture Orbit Observation 1 | 13 Apr 2006 | Capture Orbit Observation 2 | 14 Apr 2006 | Capture Orbit Observation 3 | 16 Apr 2006 | Capture Orbit Observation 4 | 17 Apr 2006 | Capture Orbit Observation 5 | 19 Apr 2006 | First Operational orbit | 07 May 2006 | (17th Apocentre) | | Case Commissioning Start | 14 May 2006 | Extended Case Commissioning Start | 24 May 2006 | Nominal Science Start MTP002 | 04 Jun 2006 | Safe Mode 01 | 13 Jun 2006 | Mission Commissioning Results | 04 Jul 2006 | Review | | Safe Mode 02 | 25 Aug 2006 18:15 UTC | Safe Mode 03 | 22 Sep 2006 19:24 UTC | Safe Mode 04 | 27 Sep 2006 04:37 UTC | Safe Mode 05 | 09 Oct 2006 04:20 UTC | VIRTIS-H and VIRTIS-M shutdown | 13 Aug 2007 | due to cooling Motors | | VIRTIS-M restarted | 31 Aug 2007 | Payload Off due to SADE-A | 25-27 Aug 2007 | misalignment | | VIRTIS-H restarted | 04 Nov 2007 | Safe Mode 06 | 27/28 Jan 2008 | VIRTIS-M cooler failure | 27 Oct 2008 23:58 | VIRTIS-M unit resumed non cooler | 28 Jan 2009 | operations in only the | | visible channel | | ---------------------------------------------------------------- Moreover, about every 6 months a SSMM problem (named SCET problem) occurs for about 15 minutes. During this time, the spacecraft cannot record data and the data is lost. This problem does not really affect archive but it is put in the mission catalog as a general information.
Creator Contact DELVA MAGDA
Date Published 2012-01-01T00:00:00Z
Publisher And Registrant European Space Agency
Credit Guidelines European Space Agency, 2012, VEX-V-Y-MAG-2-EXT3, V1.0, European Space Agency, https://doi.org/10.57780/esa-x27wrcz