Gene, Danny: If so some reason I don't get to JPL Friday night, this is my recommendation for the MEX bistatic radar operation. Dick - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2005/344 ----- 02:10 Begin Pre-cal at DSS 14 Start recording after Step 4; stop after Step 18 05:10 Beginning of track (no spacecraft signals) 05:20 Ingress occultation (no spacecraft signals) 05:58 FRO_x = -8000 Hz; FRO_s = -2500 Hz X-RCP FGAIN = 68 dB; all others 60 dB 05:59 Begin 25 kHz recording 06:10 Begin MiniCal #1 06:23 Begin Slew #1 06:24 S Tx ON (spacecraft still in occultation) 06:25 End MiniCal #1 (end of Step 5) Egress occultation 06:31 X Tx ON 06:38 End Slew #1 Begin 100 kHz recording 06:49 Predicted strongest surface echoes 07:05 Begin MiniCal #2 07:08 End 100 kHz recordings 07:09 Begin Slew #2 07:20 End MiniCal #2 07:23 End Slew #2 07:49 S-Tx OFF Declare EOT (radio science no longer needs tracking) 07:55 Begin Post-cal (approximate) 08:10 Scheduled EOT 08:30 End post-cal (approximate) End 25 kHz recordings 09:10 Scheduled end of Post-cal Scheduled EOA