* HIFI_Readme C028_61 1. Date and time of delivery: 2010-11-11 06:00 2. HIFI individual(s) to be contacted where problems arise with the delivery: - Calibration Scientist: David Teyssier - database administrator: Kevin Edwards 3. Cycle 28 - delivery for CAL CUS 4. delivery: - HIFI_AOR_C028_61.aor - HIFI_DUR_C028_61.txt - HIFI_Readme_C028_61.txt (this file) - duration_cal.sh 5. configuration control a) HIFI_PHS_R_069 b) - c) hifiphs_ops_pv@iccdb1.sron.rug.nl d) hcss.dp.hifi: 4.0.1349 6. AOR file issues a) HSpot: 5.1.1, PHS: 630, MPS: 4.0.1349 b) 6 c) HSpot total time: 08:59:11 7. Spacecraft database issues a) MIB 2154 b) HPSDB HPSDB_MOC_HERSCH_CCS_issueMOC9_201003161700 c) OBSM 6.4.2 8. n/a 9. applicable SxRs: 10. Instruction for scheduling of calibration observations in HIFI cycle 28 A. Template AOR for ICU SEU Checks on the MTL This AOR is to be scheduled at the start of every OD where HIFI is NOT prime instrument. As such this does not apply directly to the HIFI ODs of cycle 28, but this should be put at the beginning of the DTCP (before the SPIRE checksum AOR) at the earliest convenience for the mission planners. HifiEngOBS_SEU_check_DTCP B. Purity tests in band 5a The following AOR should ideally be combined with other observations in band 5a. If there are other observations in 5a, the two AOR below should be scheduled as the last ones in this band. The LO switch-on is not part of the delivery but if this AOR is the only observation in band 5a, a SHORT LO switch-on is needed. Aot3_S_DBSFastNoC_5a_Full_R3_IRC10216 HifiEngSetIntoPrimary_After_B5a C. Calibration of band 1a after purification UNLIKE THE OTHER AORS USING MC H61, THIS AOR MUST BE SCHEDULED USING MC H62. The following AOR should ideally be combined with other observations in band 1a. The LO switch-on is not part of the delivery but if this AOR is the only observation in band 1a, a SHORT LO switch-on is needed. Aot3_S_DBSNoC_1a_520-553.4_R4_IRC10216 D. Quarterly Functional test: diplexer calibration. The following tests can be performed in the DTCP. Each of those tests starts in the "a" LO band of band 3 or band 7 resp., and finishes in the "b" LO band of band 3 or band 7 respectively. This can be useful to know if scientific observations are scheduled on either side of those engineering AORS. The test itself can be used as the equivalent of a SHORT LO switch-on. Note that those tests are self-contained and do not need any band switch. HifiEng_Diplexer_calibration_vs_D2_COP_B3_QSFT3 HifiEng_Diplexer_calibration_vs_D2_COP_B7_QSFT3 11. execute supplied script 'duration_cal.sh HIFI_AOR_C028_61' in a directory where file HIFI_AOR_C028_61.aor exists and compare output (if any) with info listed under b) a) duration_cal.sh b) Total duration of HifiEng_Diplexer_calibration_vs_D2_COP with default parameters = 5099 Total duration of HifiEngOBS_SEU_check with default parameters = 19 Total duration of HifiEngSetIntoPrimary with default parameters = 6 Total duration of HifiSScanModeDBS with default parameters = 386 Total duration of HifiSScanModeFastDBS with default parameters = 338 Total duration of HifiSScanModeFSwitch with default parameters = 500 Total duration of HifiSScanModeFSwitchNoRef with default parameters = 417 Total duration of HifiSScanModeLoadChop with default parameters = 350 Total duration of HifiSScanModeLoadChopNoRef with default parameters = 285