(1) Date & Time of delivery 25th November 2009 13:30 GMT (2) ICC individual to be contacted where problems arise with the delivery (1) Sarah Leeks (RAL) (2) Luca Conversi (HSC) Note: always copy spire@rl.ac.uk (3) Time range for which the data being delivered is applicable OD 201 (4) Delivery information - names of all files contained in the tar file SPIRE_MC_pv62_FULL_41_0_CUS.def SPIRE_MC_pv62_FULL_41_0_CUS_CAL.xml SPIRE_AOR_OD0201_1_0.aor SPIRE_SSF_OD0201_1_0.ssf SPIRE_POS_OD0201_1_0.pos SPIRE_ICP_OD0201_1_0.icp Command scripts: SPIRE_CUS_THCP.py SPIRE_Duration.txt SPIRE_Readme_OD0201_1_0.txt (5) CUS Script amd Calibration files ICC internal configuration control issues (a) Name of ICC mission configuration from which files were exported (for reference purposes only) pvPhase_mconfig_62 (b) Name of the CVS Tag related to this delivery (if relevant) (c) Name of the ICC Database containing this delivery (for reference purposes only) mps_phs_1 (d) HCSS version used when working with these files Version 1.2.0 (1721) for PHS Version 1.2.2 (1724) for MPS (although we just just HSpot and cus for this delivery) (6) AOR Files issues (a) HSpot, PHS and MPS versions used HSpot v4.3.5, PHS 593 over 1721 (reported as 1), Build #593 MPS: see point 5d. (b) Number of AORs delivered in the .aor file 60 (c) Overall Time Estimation calculated by HSpot 19h57m30s (7) Spacecraft Database issues (a) ICC MIB version applicable to these cus & calibration files SPIRE 4.0.02 PR (b) HPSDB version (if known) that contains this MIB HPSDB_MOC_HERSCH_CCS_issueMOC5_200910261200 (c) OBSM software version on the instrument applicable to this MIB the one currently loaded on the S/C (8) Go-ahead of the ICC CCB (if applicable) (9) SxRs applicable to the updates of the scripts delivered in this release (10) Additional notes e.g. special installation instructions, HIFI Sequencer code version to be used at HSC, messages for missioning planning (like change default avoidance setup) etc (a) default avoidance setup used (b) Solar System Objects scheduled on this OD: We leave 8933s after the cooler recycle, update tables and REDYtoPHOT_STBY. Please use this time to schedule SDP/RP SPIRE Photometer observations. (11) CusCmdscript output file (see Note below) (a) Name of CusCmdScript SPIRE_CUS_THCP.py MC_pv62_FULL_40 (b) Expected durations when this is run see SPIRE_Duration.txt