(1) Date & Time of delivery 4th November 2009 16:20 GMT (2) ICC individual to be contacted where problems arise with the delivery (1) Sarah Leeks (RAL) (2) Brian O'Halloran (IC) Note: always copy spire@rl.ac.uk Also note, that we list people who you can be contacted about the delivery here as usual, however really the person to contact depends on who is on duty that day which can be seen in http://www.herschel.be/twiki/pub/Spire/CopPV/The_Masterplan.pdf under scheduling, although emailing in response to this email (to the SPIRE operations and all the SPIRE people) should always get your message to the relevant people. (3) Time range for which the data being delivered is applicable OD 180 (4) Delivery information - names of all files contained in the tar file SPIRE_MC_pv58_FULL_37_0_CUS.def SPIRE_MC_pv58_FULL_37_0_CUS_CAL.xml SPIRE_SSF_OD0180_1_0.ssf SPIRE_POS_OD0180_1_0.pos SPIRE_ICP_OD0180_1_0.icp SPIRE_AOR_OD0180_1_0.aor Command scripts: SPIRE_CUS_THCP.py SPIRE_Duration.txt SPIRE_Readme_OD0180_1_0.txt (5) CUS Script amd Calibration files ICC internal configuration control issues (a) Name of ICC mission configuration from which files were exported (for reference purposes only) pvPhase_mconfig_58 (b) Name of the CVS Tag related to this delivery (if relevant) (c) Name of the ICC Database containing this delivery (for reference purposes only) mps_phs_1 (d) HCSS version used when working with these files Version 1.2.0 (1721) for PHS Version 1.2.2 (1724) for MPS (6) AOR Files issues (a) HSpot, PHS and MPS versions used HSpot v4.3.5, PHS 593 over 1721 (reported as 1), Build #593 MPS: see point 5d. (b) Number of AORs delivered in the .aor file 47 (c) Overall Time Estimation calculated by HSpot 23h49m35s (7) Spacecraft Database issues (a) ICC MIB version applicable to these cus & calibration files SPIRE 3.0.B2 PR (b) HPSDB version (if known) that contains this MIB HPSDB_MOC_HERSCH_CCS_issueMOC5_200910261200 (c) OBSM software version on the instrument applicable to this MIB the one currently loaded on S/C (8) Go-ahead of the ICC CCB (if applicable) Okay given by Sarah Leeks (9) SxRs applicable to the updates of the scripts delivered in this release SpireSpr:2049, SpireScr:2101, SpireScr:2122, SpireScr:2130, SpireScr:2129 (10) Additional notes e.g. special installation instructions, HIFI Sequencer code version to be used at HSC, messages for missioning planning (like change default avoidance setup) etc (a) default avoidance setup used (b) Solar System Objects scheduled on this OD: We observe moving targets Neptune and the asteroid 88 Thisbe. This is the first day the new MIB/HPSDB (HPSDB_MOC_HERSCH_CCS_issueMOC5_200910261200) is used There is a LoadTable observation after the Cooler Recycle. We don't include STBY-REDY at the end of the day TM =68.8 % (on whole day = 26 hours) (11) CusCmdscript output file (see Note below) (a) Name of CusCmdScript SPIRE_CUS_THCP.py MC_pv58_FULL_37 (b) Expected durations when this is run see SPIRE_Duration.txt