(1) Date & Time of delivery 19th September 2009 13:50 BST (2) ICC individual to be contacted where problems arise with the delivery (1) Tanya Lim (RAL) (2) Brian O'Halloran (IC) Note: always copy spire@rl.ac.uk Also note, that we list people who you can be contacted about the delivery here as usual, however really the person to contact depends on who is on duty that day which can be seen in http://www.herschel.be/twiki/pub/Spire/CopPV/The_Masterplan.pdf under scheduling, although emailing in response to this email (to the SPIRE operations and all the SPIRE people) should always get your message to the relevant people. (3) Time range for which the data being delivered is applicable OD 134 (4) Delivery information - names of all files contained in the tar file SPIRE_MC_pv48_FULL_30_0_CUS.def SPIRE_MC_pv48_FULL_30_0_CUS_CAL.xml SPIRE_SSF_OD0134_1_0.ssf SPIRE_POS_OD0134_1_0.pos SPIRE_ICP_OD0134_1_0.icp SPIRE_AOR_OD0134_1_0.aor Command scripts: SPIRE_CUS_THCP.py SPIRE_Duration.txt SPIRE_Readme_OD0134_1_0.txt (5) CUS Script amd Calibration files ICC internal configuration control issues (a) Name of ICC mission configuration from which files were exported (for reference purposes only) pvPhase_mconfig_48 (b) Name of the CVS Tag related to this delivery (if relevant) (c) Name of the ICC Database containing this delivery (for reference purposes only) mps_phs_1 (d) HCSS version used when working with these files Version 1.1.0 (1600) (6) AOR Files issues (a) HSpot, PHS and MPS versions used HSpot v4.3.0 (second release), PHS over 1600, Build #580 (b) Number of AORs delivered in the .aor file 40 (c) Overall Time Estimation calculated by HSpot 21h28m58s (7) Spacecraft Database issues (a) ICC MIB version applicable to these cus & calibration files SPIRE 3.0.B2 PR (b) HPSDB version (if known) that contains this MIB HPSDB_MOC_HERSCH_CCS_issueMOC3_200908141600 (c) OBSM software version on the instrument applicable to this MIB the one currently loaded on S/C (8) Go-ahead of the ICC CCB (if applicable) Okay given by Tanya Lim (9) SxRs applicable to the updates of the scripts delivered in this release SpireSpr: 1612, SpireScr: 1933, SpireScr: 1967, SpireScr: 1968, SpireScr: 1969, SpireSpr: 1970, SpireSpr: 1971, PhsScr:1183, SpireSpr: 1924 (10) Additional notes e.g. special installation instructions, HIFI Sequencer code version to be used at HSC, messages for missioning planning (like change default avoidance setup) etc (a) default avoidance setup used (b) Solar System Objects scheduled on this OD: The default avoidance setup is used. We return from PHOT_STBY to REDY at the end of OD134. (11) CusCmdscript output file (see Note below) (a) Name of CusCmdScript SPIRE_CUS_THCP.py (b) Expected durations when this is run see SPIRE_Duration.txt