(1) Date & Time of delivery 04th August 2009 17:40 BST (2) ICC individual to be contacted where problems arise with the delivery (1) Sarah Leeks (RAL) (2) Ivan Valtchanov (HSC) Note: always copy spire@rl.ac.uk Also note, that we list people who you can be contacted about the delivery here as usual, however really the person to contact depends on who is on duty that day which can be seen in http://www.herschel.be/twiki/pub/Spire/CopPV/The_Masterplan.pdf under scheduling, although emailing in response to this email (to the SPIRE operations and all the SPIRE people) should always get your message to the relevant people. (3) Time range for which the data being delivered is applicable OD 86 (4) Delivery information - names of all files contained in the tar file SPIRE_MC_pv32_FULL_19_0_CUS.def SPIRE_MC_pv32_FULL_19_0_CUS_CAL.xml SPIRE_SSF_OD0086_1_0.ssf SPIRE_POS_OD0086_1_0.pos SPIRE_ICP_OD0086_1_0.icp SPIRE_AOR_OD0086_1_0.aor Command scripts: SPIRE_CUS_THCP.py SPIRE_Duration.txt SPIRE_Readme_OD0086_1_0.txt (5) CUS Script amd Calibration files ICC internal configuration control issues (a) Name of ICC mission configuration from which files were exported (for reference purposes only) pvPhase_mconfig_32 (b) Name of the CVS Tag related to this delivery (if relevant) (c) Name of the ICC Database containing this delivery (for reference purposes only) mps_phs_1 (d) HCSS version used when working with these files Version 1.1.0 (6) AOR Files issues (a) HSpot, PHS and MPS versions used HSpot v4.3.0 (second release), PHS over CIB 1565, Build #580 (b) Number of AORs delivered in the .aor file 36 (c) Overall Time Estimation calculated by HSpot 15h10m31s (7) Spacecraft Database issues (a) ICC MIB version applicable to these cus & calibration files SPIRE 3.0.B2 PR (b) HPSDB version (if known) that contains this MIB HPSDB_R_TM_HERSCH_FM1_M_903062241 (c) OBSM software version on the instrument applicable to this MIB the one currently loaded on S/C (8) Go-ahead of the ICC CCB (if applicable) Okay given by Sarah Leeks (9) SxRs applicable to the updates of the scripts delivered in this release SpireSpr: 1587, SpireScr: 1768 (10) Additional notes e.g. special installation instructions, HIFI Sequencer code version to be used at HSC, messages for missioning planning (like change default avoidance setup) etc (a) default avoidance setup used (b) Solar System Objects scheduled on this OD: There are not any moving targets The default avoidance setup is used. We have 12k TC COUNTs We have included a dummy obs at the start which should be deleted. Our first observation is the Colloer Recycle. This was done so that we started at the right position relative to PACS. Our start time is after PACS at 22:10/22:11z We do not include STBYtoREDY at the end of the OD. We use gyro calibration. (11) CusCmdscript output file (see Note below) (a) Name of CusCmdScript SPIRE_CUS_THCP.py (b) Expected durations when this is run see SPIRE_Duration.txt