1. Date & Time of delivery 17 May 2013 13:15 UT 2. ICC individual to be contacted where problems arise with the delivery (1) Sunil Sidher sunil.sidher@stfc.ac.uk Note: always copy spire@stfc.ac.uk 3. Cycle for which the data being delivered is applicable. Cycle 100 4. Delivery information - names of all files contained in the tar file SPIRE_AOR_C100_66_CAL.aor SPIRE_AOR_C100_70_ENG.aor SPIRE_CUS_THCP.py SPIRE_Duration.txt SPIRE_Readme_C100_70.txt SPIRE_MC_pv96_C100_70_CUS_CAL.xml SPIRE_MC_pv96_C100_70_CUS.def 5. Cus Script & Calibration files ICC internal configuration control issues (a) Name of ICC mission configuration from which files were exported (for reference purposes only) pvPhase_mconfig_96 (b) Name of the CVS Tag related to this delivery (if relevant) N/A (c) Name of the ICC Database containing this delivery (for reference purposes only) mps_phs_1 (d) HCSS Cus version used when working with these files HCSS 10.0, Build 2837 6. AOR File issues (a) HSpot, PHS & MPS versions used : Note if you don't use MPS then no need to mention it HSpot 6.3.2 Final End of Operations Version MPS 1387, HCSS Track 2.0 (b) Number of AOR files delivered in the .aor file CAL: 1 ENG: 12 (c) Overall Time Estimation calculated by HSpot - In Hours, Minutes & Seconds CAL: 0.4 Hours (00:25:26) ENG: 18.8 Hours (18:47:37) 7. Spacecraft Database issues (a) ICC MIB version applicable to these cus & calibration files SPIRE 4.0.02 PR (b) HPSDB version (if known) that contains this MIB HPSDB_MOC_HERSCH_CCS_issueMOC13_201110111030 (c) OBSM software version on the instrument applicable to this MIB the one currently loaded on the S/C 8. Go-ahead of the ICC CCB (if applicable) N/A 9. SxRs applicable to the updates of the scripts delivered in this release - If there is an ASTR Mission Configuration delivery, then flag the high level SxR which contains the list of SxRs since the last ASTR delivery that affect a released AOT + list other SxRs that are calibration MC specific SpireScr:4994 SpireScr:4999 SpireScr:5021 10. Additional notes (a) Update Information : If this corresponds to an update since the last delivery, explain what the updates consist of e.g. 2 more AORs added. (c) Instructions for the Mission Planners - A list with all the solar system objects that are going to be observed. This will include specification of the constraints (if any) that has to be modified in the MPS properties file. N/A **Important** - This new calibration MC has updated AORs for the REDY-STDBY scripts which are included in the AOR file SPIRE_AOR_C100_70_ENG.aor. Only the AORs in this delivery should be used. #SPIRE observations for OD 1475 (SPIRE TEST B) ===================================================== Scheduling instructions (for obs marked with '*'): -------------------------------------------------- - Please start the scheduling of AORs about 15-20 minutes after the end of DTCP 1475. - As there are no other activities planned in this OD, please leave a ~5-10 minute gap between AORs. The following sequence of AORs need to be scheduled for SPIRE TEST B in exactly the order given, using only the AORs in this delivery: SPIRE-P Tests: A: SpirePhoto_Cal_JfetVssTestCGen - No Pointing B: SpireEngREDYtoPHOT_STBYGen - No Pointing C: SpirePhoto_Cal_StdLoadCurveGen-DarkSky-PSWE6 - Dark Sky D: SPhoto-PointS-Rep4-DarkSky - Dark Sky E: SpireEngPHOT_STBYtoREDYGen - No Pointing SPIRE-S Tests: A: SpireSpectro_Cal_JfetVssTestCGen B: SpireEngREDYtoSPEC_STBYGen C: SpireSpectro_Cal_StdLoadCurveGen-DarkSky E: SpireEngSPEC_STBYtoREDYGen F: SpireEngSmecScanGen-LR-Rep20 F: SpireEngSmecScanGen-HR-Rep10 Justifications: --------------- A: Covered by Rcal Plan section 4.3.2 Detectors, JFETs B: Mode transition REDY2STBY C: Covered by Rcal Plan section 4.2.1 Detector Load Curves D: Covered by RCal Plan section 4.2.4 AOTs and section 4.3.3 BSM E: Mode transition STBY2REDY F: Warm SMEC engineering scan test #SPIRE observations for OD 1484 (SPIRE TEST C - Day 1) ===================================================== Scheduling instructions (for obs marked with '*'): -------------------------------------------------- There is only one AOR for scheduling in OD 1484. Please start the scheduling about 15-20 minutes after the end of DTCP 1484. Observations: ------------- A: SpireEngEepromNominalGen - No Pointing Justifications: --------------- A: Integrity test of the Nominal DPU EEPROM - Primary & Secondary partitions #SPIRE observations for OD 1485 (SPIRE TEST C - Day 2) ===================================================== Scheduling instructions (for obs marked with '*'): -------------------------------------------------- There is only one AOR for scheduling in OD 1485. Please start the scheduling about 15-20 minutes after the end of DTCP 1485. Observations: ------------- A: SpireEngEepromRedundantGen - No Pointing Justifications: --------------- A: Integrity test of the Redundant DPU EEPROM - Primary & Secondary partitions 11. CusCmdscript output file (see note below) (a) Name of CusCmdScript SPIRE_CUS_THCP.py (b) Expected durations when this is run SPIRE_Duration.txt