From: Bernard.Collaudin@space.alcatel.fr Sent: 19 October 2001 16:48 To: valerie.demuyt@ias.u-psud.fr; charra@ias.fr; taddei@tesre.bo.cnr.it; butler@tesre.bo.cnr.it; pacs@mpe.mpg.de; ohb@mpe.mpg.de; J.A.Long@rl.ac.uk; k.j.king@rl.ac.uk; HIFI-Prof@sron.nl; C.K.Wafelbakker@sron.nl; alfred.E.Nash@jpl.nasa.gov Cc: Glenn.Lund@space.alcatel.fr; astrid.heske@esa.int; Jean.Bruston@esa.int; Javier.Marti.Canales@esa.int; Olivier.Fratacci@space.alcatel.fr Subject: Connectors on Instrument You are aware that there is a running action on all instruments to define the position of connectors on your unit boxes, in order to initiate the design of the harness in the SVM and PLM's. Our SVM contractor has compiled a list of required information necessary to start the design of the harness (Both for Herschel (sheet 1), and Planck (sheet 2)). We assume that the constraints on cable length are all described in chapter 5.3 of IID-B's, otherwise not applicable. Can you have a look to this, and provide the missing information. (See attached file: reqharness.xls) The IDS format sent to you some time ago, and attached below could be used to answer. (See attached file: ICD_Instrument_1.dot) Best regards, Bernard Bernard COLLAUDIN - Alcatel Space Industries - V1Z-B21 100, Bd du midi, BP 99 - 06156 Cannes la Bocca Cedex- France Tel:+(33)(0) 4 92 92 30 21 Fax: +(33)(0) 4 92 92 30 10 Mob: +(33)(0)6 18 42 78 35 email: bernard.collaudin@space.alcatel.fr ALCATEL SPACE INDUSTRIES