Observation Summary

OBSID:1342271019
Instrument:PACS
AOR label:PacsPhoto-HD6798-100-70 - resched
Proposal:OT2_isong_5
Target:HD 6798
Actual RA:1h 12m 14.67s
Actual Dec.:79° 40' 23.72''
Purpose:---
Concat.:1342271019,1342271020
OD:1445
Start:2013-04-27T17:27:38.000000 TAI (1745774858000000)
Duration:136.0 seconds (incl. spacecraft on-target slew time)

AOT and instrument configuration:

AOT:PacsPhoto
Blue ch.:100 micron band
Mode:Scan map


System configuration summary

SPG pipeline version:SPG v14.2.0
SPG pipeline products creation date:2016-08-29T02:31:16.451000 TAI (1851129076451000)
Mission configuration:MC_H102ASTR_P70ASTR_S66ASTR_RP
Processed to level:RED: 2.5 BLUE: 2.5
Quality Control:PASSED
Action:NONE

Quality comments

Half of the red array is lost.