Observation Summary

OBSID:1342239503
Instrument:PACS
AOR label:PACS - upper
Proposal:OT1_gstacey_4
Target:ngc 891 - spire upper pointing-1
Actual RA:2h 22m 37.29s
Actual Dec.:42° 22' 41.93''
Redshift:0.001761 (z)
Purpose:---
Concat.:---
OD:1014
Start:2012-02-22T06:23:23.000000 TAI (1708583003000000)
Duration:13810.0 seconds (incl. spacecraft on-target slew time)

AOT and instrument configuration:

AOT:PacsLineSpec
Mode:Pointed, Chop/Nod
Bands:B2B R1 (prime diffraction orders selected)
Is bright:NO (default range mode)
Chopper:medium throw
Nod cycles:6

Observation block summary

Name(*)CameraIDBand(*)Wave(*)WaveMinWaveMaxRepetitions(*)ActualRepCapacitanceOutOfBandChannel
micrometermicrometermicrometerpF
CO 14-13red102R1186.327185.420187.246220.14Noprime
-blue2B2B-92.72093.640220.14Noparallel
H20 212-101red103R1179.843178.886180.825110.14Noprime
-blue3B2B-89.45790.426110.14Noparallel
H20 303-212red104R1174.934173.941175.960110.14Noprime
-blue4B2B-86.98587.993110.14Noparallel
H20 M1red106R1108.260106.966109.715110.14Noprime
-blue6B2B-53.47154.8801--Yes, fullyparallel
H20 M2red105R1113.740112.467115.171110.14Noprime
-blue???---1--???parallel
(*) = requested in HSPOT

System configuration summary

SPG pipeline version:SPG v14.2.0
SPG pipeline products creation date:2016-07-26T22:23:01.050000 TAI (1848262981050000)
Mission configuration:MC_H98ASTR_P69ASTR_S66ASTR_RP
Processed to level:RED: 2.0 BLUE: 2.0
Quality Control:PASSED
Action:NONE

Quality comments

No comments added